14.4. LRI Form (Last Run Information)


The LRI form displays a summary of information about to the last run of a group or job.

Last Run Information (LRI) Form

Run Duration

  • Begin: Date and time when the group or job started to run.
  • End: Date and time when the group or job finished running.
  • Duration: Total time the group or job ran.

Run Context

  • Context: There are 2 possible Run Contexts
    • UI (User Interface): When a group or job is run "manually" by a user from the client.
    • Scheduler: When a group or job is run automatically by the scheduler.
  • Run Number: Each time a group or job is run, its Run Number is incremented so you can know how many times it has run. The Run Number is reset to 0 when the group or job is reset.

Run Result

  • Result: Shows the overall run result. Possible values are:
    • Success: The run completed successfully
    • Cancelled: The run was cancelled by the user
    • Warning(s): The run completed but produced one or more warnings
    • Error(s): The run completed but produced one or more errors
    • Failed: The run failed to complete
  • Rows Exported or Loaded: Shows the number of rows that were exported or loaded.
  • Errors: Number of errors that occurred during the run.
  • Warnings: Number of warnings that occurred during the run.